← All guides

Guide

Private House Sale Document Checklist: What and When

Most private sales that drag on don't stall because of the buyer or the price. They stall because a document turns up late, or a solicitor asks for something the seller has never heard of. If you gather your paperwork in the right order, you can cut weeks off the time from accepted offer to completion, and you'll have far fewer surprises along the way.

This guide sorts the documents into stages: what you need before you list, what to have ready once an offer comes in, and what your conveyancer will ask for during the legal work.

Stage 1: Before you list your property

Energy Performance Certificate (EPC)

In England, Wales and Northern Ireland you need a valid EPC, or to have commissioned one, before you start marketing. An EPC lasts ten years, so check the government register first, because you may already have one.

Home Report (Scotland only)

Selling in Scotland? You need a Home Report before the property goes on the market. It's a pack of three documents: a single survey, an energy report and a property questionnaire. It's valid for marketing for 12 weeks, so don't commission it months too early.

Material information

Buyers expect key facts up front, and listing portals increasingly ask for them. Have these ready:

  • Council tax band (England and Wales) or domestic rates (Northern Ireland)
  • Tenure: freehold, leasehold, share of freehold or commonhold
  • For leaseholds: years remaining on the lease, ground rent and service charge
  • Utilities: how the property is heated, the water and sewerage supply, broadband and mobile coverage
  • Parking arrangements
  • Known issues such as flood risk, building safety concerns, rights of way or restrictive covenants

Being upfront here stops buyers pulling out later over something you could have mentioned on day one. When you create a listing on Keyzee, the setup steps prompt you for most of this, so nothing gets missed.

Proof of ownership

Most homes in England and Wales are registered with HM Land Registry. You can download the title register and title plan online for a small fee. Read through them now: check the names match yours, look for any restrictions or charges, and make sure the boundaries look right.

If your property is unregistered, which is common if it hasn't changed hands in decades, you'll need the original paper deeds. Find them early, because tracking them down can take time.

Stage 2: Once you've accepted an offer

Your ID and anti-money laundering checks

Your conveyancer is legally required to verify who you are before acting for you. Expect to provide:

  • Photo ID (passport or driving licence)
  • Proof of address dated within the last three months, such as a utility bill or bank statement
  • In some cases, extra evidence that you're the registered owner

Do it the day you instruct them, because nothing else moves until it's done.

Memorandum of sale

On a private sale there's no agent to draw this up, so you'll need to send both solicitors a short summary of the agreed price, the buyer's and seller's details, their solicitors' contact details and any conditions agreed. Keyzee generates one for you once you mark an offer as accepted, but a clear email with the same information works too.

Mortgage details

If you have a mortgage, have your lender's name and account number to hand. Your solicitor will request a redemption statement so the loan can be paid off on completion.

Stage 3: During conveyancing

Property information forms

In England and Wales, your solicitor will send you the TA6 Property Information Form and the TA10 Fittings and Contents Form. Leasehold sellers will also complete the TA7. Answer them honestly: if you mislead the buyer, they could have a claim against you after completion.

Fill them in as soon as they arrive. Late forms are one of the most common causes of delay.

Certificates and approvals for work done

This is where gaps tend to appear. Go through any changes made to the property while you've owned it and gather:

  • Building regulations completion certificates for extensions, loft conversions, structural changes or removed walls
  • Planning permission for anything that needed it
  • FENSA or CERTASS certificates for replacement windows and doors installed since 2002
  • Electrical certificates for rewiring or new circuits, usually from a registered electrician under Part P
  • Gas Safe certificates for boiler installations
  • Guarantees and warranties, such as damp proofing, timber treatment, a new roof, or NHBC cover for a newer home

Leasehold documents

If you're selling a leasehold flat, your solicitor will need a management pack from the freeholder or managing agent. It covers service charge accounts, planned major works, insurance and building safety information. These packs carry a fee and can take weeks to arrive, so order one as soon as you have a buyer, or even before.

Special circumstances

Some sales need extra paperwork:

  • Selling as an executor: the grant of probate (or confirmation in Scotland)
  • Selling after separation: a court order or written agreement if a former partner has an interest
  • Japanese knotweed: a management plan with an insurance-backed guarantee

What if a document is missing?

Don't panic. Missing paperwork is common and usually fixable.

  • Lost FENSA certificate: you can usually get a replacement from the scheme's website.
  • No building regulations sign-off: you can apply to the council for a regularisation certificate, although an inspector may need to open up work for inspection. Many sellers take out indemnity insurance instead, which is quick and relatively cheap. Don't contact the council before speaking to your solicitor, because doing so can make indemnity cover unavailable.
  • Missing guarantees: contact the company that did the work, or check whether a guarantee scheme holds records.

Spot gaps before the buyer's solicitor does. Raising them yourself looks organised; having them discovered halfway through looks like you're hiding something.

A simple way to stay organised

Create one folder, physical or digital, and work through the stages above. Scan everything. When your solicitor asks for a document, you'll be able to send it within minutes rather than days, and that responsiveness often makes the difference between a sale that completes in ten weeks and one that takes five months.

If you're ready to sell without paying agent commission, list your home on Keyzee. The listing flow walks you through the information buyers need, and you keep full control of your sale from first viewing to completion.

Add property
Add property
Add property